Skip to Main Content
ajax loader animation
ajax loader animation

SmartCharge Tech Incentives

Receive cash incentives when you install eligible load management technologies on commercial EV charging stations for public, workplace, multifamily, industrial, and fleet charging.

Apply Now (PDF)
null

ARE YOU ENROLLED IN SMARTCHARGE COMMERCIAL?

You must be participating in the SmartCharge Commercial and/or the EV Phase-In Rate program to be eligible for this program.

About

The SmartCharge Tech Program is accelerating the transition to sustainable transportation by helping customers switch to smart energy solutions. We are currently offering funds for EV sites to install load management and battery storage technologies. These systems help EV sites balance charging loads, improve efficiency, reduce peak demand, and build reliable, cost-effective infrastructure.

Back to top

Eligibility Requirements

Your EV Charging Site Must:

  • Be participating in the SmartCharge Commercial and/or the EV Phase-In Rate program.
  • Be able to install eligible load management technology capable of balancing, curtailing, or deferring applicant’s EV charging demand on the electric grid.

What’s Eligible:

  • Load Management Systems (Hardware or Software)
  • Energy Management Systems (Hardware or Software)
  • Battery Integrated Charging
  • On-site Battery Storage

Documents You Will Need:


  • A load management technology spec sheet with required certifications
  • Invoices for technology installed
  • A single line diagram of installed equipment
Back to top

How to Apply

Step 1

Go over the eligible technology and required certification list.

Step 2

Submit an application.

Step 3

Submit proof of equipment installation, technology specification with certifications, and material invoices.
Questions? Email Us.
Back to top

Incentives

The incentive percentage in the chart refers to the amount of customer-side and utility-side costs covered.

Back to top

Incentive

Tier 1 (only smartcharge commercial)

Tier 2 (EV Phase-In Rate With or Without SCC)

Incentive

Load Management software

Tier 1 (only smartcharge commercial)

Up to 90%

Tier 2 (EV Phase-In Rate With or Without SCC)

Up to 45%

Incentive

DER: battery storage

Tier 1 (only smartcharge commercial)

Up to 60%

Tier 2 (EV Phase-In Rate With or Without SCC)

Up to 30%

Incentive

Load limiting hardware

Tier 1 (only smartcharge commercial)

Up to 60%

Tier 2 (EV Phase-In Rate With or Without SCC)

Up to 30%